The WaterGuard system requires a small area of concrete around the perimeter to be removed. The drainage system is laid right on the footer and then the concrete is replaced with the exception of a small gap along the base of the wall where water is captured and directed into the drainage system. Once the concrete is replaced, you almost don't even know that the system is there.